The 10-lane Port Mann bridge. (Transportation Investment Corp.)

Port Mann Bridge review points to B.C. government’s flaws in expertise, risk management

Report takes aim at how the $3.3 billion mega-project was handled

The B.C. government needs to fix how it manages risk, timelines and documents before it undertakes another mega-project like the Port Mann bridge, an independent report has found.

The 174-page report, commissioned last year from Perrin, Thorau and Associates by the province, outlined seven broad recommendations arising from replacing the 1964-built bridge with a new, 10-lane crossing to address substantial congestion problems.

The report took aim at the province’s inability to assemble the “people, business processes and information systems” required to undertake a project of this size.

The province couldn’t properly manage risks throughout the project, the report said, and had trouble estimating the schedule, progress payments and performance measures.

Changes to the way the project was managed didn’t undergo a “competitive pricing test” to ensure they were getting the best value, it added, though the province didn’t keep proper records to determine if there had been an attempt to secure lower pricing.

READ MORE: Port Mann, Golden Ears traffic up since tolls removed: report

The $3.37-billion cost was $48 million over from the initial approval of $3.32 billion in 2009, after a public-private partnership was nixed following the global recession the year before. The government chose to took on debt and fully fund the project.

The consultants were “surprised by the extent to which the province was unable to recover key documents” in relation to that decision.

As costs increased, the report found that the province needed a better way to distribute contingency funding and revise how it estimates price markups that happen when a contractor has to change parts of the project.

The first drivers to use the new Port Mann crossed in September 2012.

Tolls, which took effect the following December, were expected to raise $175 million each year, but by 2015-16, a report from the bridge’s operator, the Transportation Investment Corporation, showed an annual operating loss at more than $100 million per year.

The finance ministry recently responded that it had already implemented the recommendations on projects undertaken since the Port Mann.

It pointed to the Evergreen Line and upcoming Pattullo Bridge replacement as examples of where a “independent cost estimator” is on-site to ensure better costing out of major projects, and said it was undertaking a review of its record management system.


@katslepian

katya.slepian@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Just Posted

Surrey boy’s birthday wish raises $13,500 for rescued farm animals in Aldergrove

Matthew Farden received a large donation from the mister Blake Foundation towards a sanctuary farm.

Langley Mounties get new tool to find drunk drivers

New legislation take effect this week that will allow broader breathalyzer testing.

Trial date postponed for man charged with killing Abbotsford police officer

Oscar Arfmann’s trial pushed back from January to May 2019

BCIHL Young Stars lose hard-fought hockey game to Kazakhstan at Langley Events Centre

Coach calls it ‘a great opportunity for those guys to have an international experience’

How some Langley students used spare change, bake sales and candy-cane-grams to help the needy

This week, three families will have a better Christmas as a result

VIDEO: Ex-NASA engineer pranks mail thieves with glitter bomb trap

Package thefts are common this time of year, but YouTuber Mark Rober used his engineering skills

Lower Mainland man receives apology after getting kicked out of library

Mike Wilson fears the same treatment he received Nov. 2 by security guards will happen to others

Canada ranks 16th on annual gender gap list

This is the second year Canada has placed 16th in the World Economic Forum’s list

VIDEO: Tornado rips through city west of Seattle

Reports indicate five to seven homes damaged in Port Orchard, Wash.

Privacy watchdog says legal cannabis buyers should use cash, not credit

Some countries could bar entry to individuals if they know they have purchased cannabis

Emergency task force calls for safe supply of drugs in Vancouver to prevent ODs

Dr. Patricia Daly says more people are dying alone in the city than elsewhere in the province

‘A start:’ Alberta critical of Ottawa’s $1.6B package for ailing energy sector

A further $150 million is to be used for clean growth and infrastructure projects

New B.C. Lions coach DeVone Claybrooks adds eight to coaching staff

DeVone Claybrooks has filled out his staff for the 2019 season

Two-year-old attacked by cougar near Mission, B.C.

Boy not seriously injured in incident on Monday afternoon

Most Read